Sub-clause 1.9 First Notice

Sub-clause 1.9 Second Notice

 

Sub-clause 1.9 [Delayed Drawings or Instructions]. The relevant sub-clause has very specific notification requirements which are not always properly complied with.

Above examples of a draft templates dealing with the first notification and second notification required in terms of this sub-clause 1.9 [Delayed Drawings or Instructions] for information. It should be noted that templates should be used with caution as any amendments to the general conditions of contract must also be considered.

Sub-clause 3.3 Notice

 

Sub-clause 3.3 [Instructions of the Engineer]. The relevant sub-clause has very specific notification requirements which are not always properly complied with.

Above example of a draft templates dealing with an oral instruction which was given by the Engineer or delegated assistant. It should be noted that templates should be used with caution as any amendments to the general conditions of contract must also be considered.

 

DELAY NOTICES – CORONA VIRUS COVID-19 – FIDIC Red Book 1999 and 2017